- This topic has 3 replies, 3 voices, and was last updated 6 years, 5 months ago by .
Viewing 3 reply threads
Viewing 3 reply threads
- You must be logged in to reply to this topic.
› Forums › Operating Systems › Windows Server 2019 › Miscellaneous › Activation
Alter instalation cant activate for 180 Days period.
Internet available, slmgr -ato not work(error).
Aby suggestions?
On Settings (aka Immersive Control Panel) it says is is activated, in the old Control Panel that it is not. If I click on the activate button in Control Panel, I get redirected to Settings, where says already activated. It is a clear bug from Microsoft.
ok,
in ‘old’ control panel not activated, on ‘new’ activated (was, after slmgr -ato already not activated)
slmgr -dlv says:
Time remaining: 13000 (10 days).
On Technet forums this is already discussed. I have posted there as well. It is clear a bug in the activation process. We shall wait and see. Perhaps a patch from Microsoft is on its way, alongside the updates next week, alongside new iso files.